Availability: | |
---|---|
Quantity: | |
BD3010/3
It is mainly used for three-sided drilling of large-size H-beam or box beam.
I. Main technical parameters (the following parameters are for reference only, subject to the technical agreement):
Name | Content | Parameter value |
Workpiece Beam Size | Web height | 1400~3000mm |
Flange width | 400~1000mm | |
Maximum raw material beam length | 15m | |
Drilling Power Head | Type | CNC feeding slide plate |
Quantity | 3 | |
Drill hole diameter | ¢12~¢50 | |
Spindle speed (rpm) | 100~450r/min | |
Axial travel (1, 3 axes) | 800mm | |
Axial travel (2 axes) | 600mm | |
Drilling feed rate | 0~4m/min | |
Spindle motor power | 3x7.5 kW | |
Servo motor power | 3x2 kW | |
Longitudinal movement of gantry (X-axis) | X-axis maximum travel | 15m |
X-axis servo motor power | 2x3 kW | |
Upper drilling power head unit | V-axis maximum travel | 2950mm |
Left drilling power head unit | U-axis maximum travel | 950mm |
Right drilling power head unit | Maximum travel of the W-axis | 950mm |
Machining accuracy | 15m length positioning accuracy | ±1.0mm |
Adjacent hole spacing error within a well group | ±0.3mm | |
U, V, W axis | Maximum movement speed | 8m/min |
U, V, W axis | Servo motor power | 3x1.5kW |
Electrical system | Control mode | PLC |
Number of CNC axis | 8 | |
Chip Evacuation and cooling systems | Motor power | 2x0.75 + 0.45 kW |
Hydraulic system | pressure | 3~7 Mpa |
flow rate | 25 L/min | |
Motor power | 3 kW |
2. The main purchased parts catalog:
No. | Name | Brand | Country |
1 | Linear guide pair | HIWIN/SHAC/HTPM | Taiwan/China |
2 | Ball screw pair | HIWIN//SHAC Nanjing process | Taiwan/China |
3 | Rack | APEX/Jingte | Taiwan, China |
4 | PLC | Siemens/Mitsubishi | Germany/Japan |
5 | Servo motor | Panasonic/Mitsubishi | Japan |
6 | Servo drives | Panasonic/Mitsubishi | Japan |
7 | Hydraulic valves | ATOS/YUKEN | Italy/Japan |
8 | Oil pump | JUSTMARK | Taiwan, China |
9 | Buttons, Indicators | Schneider/ABB | France/Germany |
3. Documents to provide:
1. One copy of product inspection certificate
2. 2 copies of Chinese instruction manual (mechanical, hydraulic, electrical).
3. 2 copies of the basic drawing
4. 2 copies of machine operation programming
5. 1 copy of servo drive use information
6. 1 copy of inverter use information
7. 2 copies of the wearing parts atlas
8. 1 copy of upper computer control software
VI. Working Environment:
1. Working power supply: three-phase four-wire system 380±10%V 50±1HZ
2. Ambient temperature: 0-40°C
3. Relative humidity of the environment: ≤75%.
It is mainly used for three-sided drilling of large-size H-beam or box beam.
I. Main technical parameters (the following parameters are for reference only, subject to the technical agreement):
Name | Content | Parameter value |
Workpiece Beam Size | Web height | 1400~3000mm |
Flange width | 400~1000mm | |
Maximum raw material beam length | 15m | |
Drilling Power Head | Type | CNC feeding slide plate |
Quantity | 3 | |
Drill hole diameter | ¢12~¢50 | |
Spindle speed (rpm) | 100~450r/min | |
Axial travel (1, 3 axes) | 800mm | |
Axial travel (2 axes) | 600mm | |
Drilling feed rate | 0~4m/min | |
Spindle motor power | 3x7.5 kW | |
Servo motor power | 3x2 kW | |
Longitudinal movement of gantry (X-axis) | X-axis maximum travel | 15m |
X-axis servo motor power | 2x3 kW | |
Upper drilling power head unit | V-axis maximum travel | 2950mm |
Left drilling power head unit | U-axis maximum travel | 950mm |
Right drilling power head unit | Maximum travel of the W-axis | 950mm |
Machining accuracy | 15m length positioning accuracy | ±1.0mm |
Adjacent hole spacing error within a well group | ±0.3mm | |
U, V, W axis | Maximum movement speed | 8m/min |
U, V, W axis | Servo motor power | 3x1.5kW |
Electrical system | Control mode | PLC |
Number of CNC axis | 8 | |
Chip Evacuation and cooling systems | Motor power | 2x0.75 + 0.45 kW |
Hydraulic system | pressure | 3~7 Mpa |
flow rate | 25 L/min | |
Motor power | 3 kW |
2. The main purchased parts catalog:
No. | Name | Brand | Country |
1 | Linear guide pair | HIWIN/SHAC/HTPM | Taiwan/China |
2 | Ball screw pair | HIWIN//SHAC Nanjing process | Taiwan/China |
3 | Rack | APEX/Jingte | Taiwan, China |
4 | PLC | Siemens/Mitsubishi | Germany/Japan |
5 | Servo motor | Panasonic/Mitsubishi | Japan |
6 | Servo drives | Panasonic/Mitsubishi | Japan |
7 | Hydraulic valves | ATOS/YUKEN | Italy/Japan |
8 | Oil pump | JUSTMARK | Taiwan, China |
9 | Buttons, Indicators | Schneider/ABB | France/Germany |
3. Documents to provide:
1. One copy of product inspection certificate
2. 2 copies of Chinese instruction manual (mechanical, hydraulic, electrical).
3. 2 copies of the basic drawing
4. 2 copies of machine operation programming
5. 1 copy of servo drive use information
6. 1 copy of inverter use information
7. 2 copies of the wearing parts atlas
8. 1 copy of upper computer control software
VI. Working Environment:
1. Working power supply: three-phase four-wire system 380±10%V 50±1HZ
2. Ambient temperature: 0-40°C
3. Relative humidity of the environment: ≤75%.